Background
Nutan Tobacco processes tobacco near Nadiad on the Ahmedabad–Baroda highway. The unit is powered by GEB and suffered severe brownouts and blackouts. Its tobacco processing line, built by a Chinese manufacturer, is about 100 metres long and includes a 50-metre motor-driven conveyor belt that passes under laser lights in a closed chamber at over 120 °C.
Challenge
Whenever the power failed, the belt stopped and material caught fire inside the closed chamber, endangering workers and disrupting the line. Fire extinguishers had to be kept ready, with a vehicle on standby to get them refilled from Baroda.
The belt is driven by a 2 HP three-phase motor, and the company needed something to keep it moving for a few minutes after a power failure. They approached more than 25 UPS manufacturers in Gujarat, and all of them declined to supply such a low-rated UPS with three-phase input and output.
Solution
After studying the application, NIFA Electronics offered and supplied a 2 kVA UPS with three-phase input, three-phase output and 15 minutes of battery backup.
Results
- Fire problem solved
- Rs. 3,000 per day saved on extinguishers, standby vehicle and diesel
- Capital cost of the UPS recovered within 6 months
- Workers now work in a tension-free environment
- Damage to machinery has stopped