Z GroupNIFA Electronics Pvt. Ltd.Maximise energy – Your right – Our duty
CFS, CWCConditioning

H.T. power control

Gujarat's first 630 kVA H.T. AVR brought balanced, stable power to a government container freight station.

At a glance
Client
Central Warehousing Corporation, CFS New Kandla
Solution
NITEL H.T. Industrial AVR, 630 kVA
Study
September 2004
Payback
Within 24 months

Background

Central Warehousing Corporation (a Govt. of India undertaking) runs a Container Freight Station at New Kandla, a container and bonded warehousing facility fed with 315 kVA of H.T. power from PGVCL. The site faced serious performance and operating problems with X-ray machines, refrigeration, yard lighting and office automation equipment.

Challenge

CWC contacted NIFA Electronics for a remedy. NIFA first carried out a power quality study in September 2004 and found heavy unbalance across all three phases with wide fluctuation, along with stress points on the HT cables.

Solution

NIFA recommended installing a 630 kVA NITEL H.T. AVR ahead of the H.T. transformer, for:

  • Stabilised, balanced supply to the entire facility
  • Fewer breakdowns of electrical equipment
  • Improved power factor
  • Lower maximum demand and load current
  • Lower power bills
  • Payback within 24 months

Results

CWC installed the equipment and achieved all of the above. NIFA Electronics also carried out a post-installation power quality study to confirm the results.

Contact

Let's stabilise your supply.

Share your load and the problem you're seeing. An engineer will get back to you with a recommendation.

Send an inquiry

Goes straight to our sales team.